Project thumbnail image
College of Engineering Unit: 
Chemical, Biological, and Environmental Engineering
Project Team Member(s): 
Fatimah Alzaki , Evie Beaty , Ryan Duffy and Devin Smith
Project ID: 
ENVE.02
Project Description: 

The Lakedale Utility District desires a treatment system for the Crestop Well to remove iron, manganese, and hydrogen sulfide while limiting disinfection byproduct formation. These constituents pose aesthetic problems to water quality. Primary criteria for treatment include water quality, dependability, community acceptance, and facility footprint. In order to accomplish this goal, a greensand filtration system was selected through an alternatives analysis and a preliminary design was conducted.

Opportunities: 
This team is open to networking
This team is open to collaboration opportunities
This team is open to employment offers

This team accepts email messages from attendees: 
smithde2@oregonstate.edu